Process Crane

Automatic clinker crane in the cement bunker

Application
Video transmission on a Mobile Crane

Operator

Utrans / Kalksteinwerk Wülfrath, Germany

Customer
Utrans / Kalksteinwerk Wülfrath, Germany

Product

Completely pre-assembled system with heavy-duty cable trolley and special round cables for traversing speeds up to 160/60 meters/min.





  • Conductix-Wampfler
    Burlington

    1435 Norjohn Ct
    Unit #5
    Burlington, ON L7L 0E6
    Canada

    Phone: (+1) 800 667 2487 (Toll free)
    Fax: (+1) 450 951 8591

    vCard
    QR-Code
    How to find us